Book in your FREE, no-obligation site inspection. Contact us today for peace of mind.

Quick Enquiry Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Quick Enquiry

Submit your enquiry using our online form and include a brief message about the type of issues you are experiencing. One of the Mainmark experts will contact you as soon as possible.

Project Profile N1145

Stabilisation Of Railway Level Crossing

Sub-industry
Rail
Problems
Subsidence
Location
NSW
Year
2001
Solutions
Re-levelling
Technology
Teretek®

The problem

A road and railway level crossing area on the NSW South Coast had subsided and was rocking, not only with the passage of trains, but also with road traffic. Both road and rail traffic had to significantly reduce speed to traverse the crossing safely. In just two days Mainmark technicians completely re-levelled and stabilised the area with injections of expanding resins into the subgrade beneath the concrete slab that crossed the road and supported the rails.

The solution

The objectives were to raise and re-level the slab to which the rails were bolted and then to strengthen and stabilise the subbase ground to prevent continuance of the movement caused by rail and road traffic over the crossing area.

The Result

There was 73mm subsidence towards the centre of the slab which had a wearing surface of bitumen. This subsidence was corrected first.

Working on one side of the road at a time, the Mainmark technicians injected Uretek expanding, engineered structural resins to raise and re-level the slab. These injections were made through the 500mm thick concrete slab at one metre centres along the outside of the rails, and at approximately 500mm centres between the rails.

Once the slab was re-levelled, the subbase was compacted by Uretek Deep-Injection. This was carried out with injections at depths of between 750mm and 1500mm below the surface, strengthening the foundation ground substantially.

Slab deflection under load was reduced to an acceptable minimum. The whole crossing area was returned to its design levels, stabilised and resupported. Just 30 minutes after completion of the Mainmark remediation, both road and rail traffic could resume full normal operation.

Resources

Project Resources & Downloads

Stabilisation Of Railway Level Crossing
Mainmark

© 2025 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

Mainmark Ground Engineering (NZ) Ltd

ISO 9001
ISO 14001
ISO 45001

Solutions

Ground Improvement

Subsidence Repair

Re-Levelling

Void Filling

Slab Lifting

Crack Wall Repairs

Sinking Floor and Slab Repair

Sinking Foundation Repair

Underpinning

Soil Replacement

Specialties

Commercial

Residential

Seismic

Technologies

Teretek®

Terefil®

JOG

About Us

Our team

Careers

Media & Press

News

Awards

Contact

Locations
Mainmark Auckland

50 Parkway Drive, Rosedale, Auckland 0632

 

Mainmark Christchurch

2 Baigent Way, Middleton, Christchurch 8024

Privacy Policy

Terms and Conditions

Created by Codex

Facebook