Power Station Floor Re-supported

Sub-industry
Power Station
Problems
Subsidence
Location
NSW
Year
2015
Solutions
Ground Improvement
Technology

A mains pipe had ruptured 3m under the concrete floor of the Bayswater #2 Power Station, causing cracks to open up and fines to be washed away from the cooling water circulation system under the floor slabs.

Background

A lack of floor support had been created, preventing the entry of the 60 tonne cranes required for the power station’s routine maintenance program.

Mainmark rectified the situation quickly and economically with Uretek Deep-Injection of expanding structural resins to fill voids and compact the subbase, consolidating the area and under-sealing the floor.

The objectives were to investigate the extent of the problem, to consolidate the foundation ground and to re- confirm full support of the concrete floor without raising it.

Solution

To establish the extent of the washout, 16mm Ø holes were drilled through the 200mm thick reinforced concrete floor on a 2.5m to 3.5m grid across an
area of 25m by 35m, where extruded fines/sand was visually observed and where ground penetrating radar scans indicated voids.

Boroscope inspections through the holes revealed
a large amount of fill material had been washed out. Substantial cracks had opened up both between cooling water circulation channel inspection pits and the underside of the floor.

Uretek Deep-Injection of expanding structural resin was carried out across the affected area via tubes through the concrete floor at 2m to 3m centres. Injection was continued until full re-support of all sections of the floor was confirmed and until resin was observed to have sealed all cracks that had opened in the cooling water system inspection pits.

Outcome

There was no excavation, little noise, no water and no mess created by this process. Minimal additional weight was added to the foundation ground. The material used is impermeable, is not brittle and will not break up. There was no interruption to the work of the power station and vehicles were able to drive over the area just 30 minutes after the Mainmark work was completed.

Without interruption to the operations of the power station, the reinforced concrete floor was fully re- supported and under-sealed against further erosion. The restoration of floor bearing capacity enabled resumption of the heavy crane traffic required for the power station’s regular maintenance program.

Next Project

Wastewater Asset Subsidence Remediated

Mainmark

© 2025 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

Mainmark Ground Engineering (NZ) Ltd

ISO 9001
ISO 14001
ISO 45001

Solutions

Ground Improvement

Subsidence Repair

Re-Levelling

Void Filling

Slab Lifting

Crack Wall Repairs

Sinking Floor and Slab Repair

Sinking Foundation Repair

Underpinning

Soil Replacement

Specialties

Commercial

Residential

Seismic

Technologies

Teretek®

Terefil®

JOG

About Us

Our team

Careers

Media & Press

News

Awards

Contact

Locations
Mainmark Auckland

50 Parkway Drive, Rosedale, Auckland 0632

 

Mainmark Christchurch

2 Baigent Way, Middleton, Christchurch 8024

Privacy Policy

Terms and Conditions

Created by Codex

Facebook