Weak ground beneath a cinema building presented a challenge during a seismic strengthening project. A proposed shear wall required screw pile foundations, but the existing soil conditions needed improvement to support the foundation solution. The client sought targeted ground treatment to increase soil resistance and reduce liquefaction potential within the identified area.
Problem
The seismic upgrade involved installing a shear wall supported by screw piles. However, the ground within the proposed foundation area was identified as too weak for the screw pile solution without supplementary ground improvement.
Treatment was required to increase cone penetration resistance, expressed as qc, and reduce the liquefaction potential of the identified soils. The ground improvement program targeted a cone resistance of 10 MPa.
The treatment area had already been excavated, requiring an approach that could be delivered within the exposed formation and integrated into the wider strengthening works. The solution needed to achieve consistent improvement across approximately 140 m², with testing used to assess the ground’s response.
Solution
Mainmark delivered a targeted Teretek® resin injection program within the existing excavation to improve the ground supporting the proposed foundation works.
Approximately 110 injection points were arranged on a 1.2 m triangular grid to provide coverage across the treatment area. Injections targeted a nominal depth of 1 m, treating soils approximately 0.5-1.5 m below the excavation surface.
An average of approximately 25 kg of expanding polyurethane resin was injected at each point. Resin expansion densified the surrounding soils, with intermediate bulk containers (IBCs) used to provide temporary surcharge loading to assist compaction during treatment.
The injection layout and surcharge approach were selected to support improvement towards the target cone resistance. Post-treatment cone penetration testing (CPT) and dynamic cone penetrometer (DCP) testing assessed the response of the treated ground.
Where testing identified areas requiring further improvement, Mainmark completed additional targeted injections.
Result
The treatment substantially increased ground resistance across the identified area. Post-treatment CPT and DCP testing generally reached refusal, indicating a marked increase in resistance to penetration within the treated ground.
A small number of areas required reinjection to address local variations in treatment response. This targeted follow-up allowed Mainmark to refine the improvement program in response to the verification test results.
The project team reported that the overall results exceeded expectations. The works addressed the weak ground identified as a constraint to the proposed screw pile foundation solution and supported the wider cinema seismic strengthening project.
Resources
Project Resources & Downloads
Strengthening Ground for a Cinema Seismic Upgrade
Download file
Please fill out this form to access this file.
Need help?
Need help with a project? Contact us today.
© 2026 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.
Mainmark Ground Engineering (NZ) Ltd