Book in your FREE, no-obligation site inspection. Contact us today for peace of mind.

Quick Enquiry Call Us

Search

If you cant find what you’re after please don’t hesitate to contact us.

Select Region

Please select the global region website you'd like to view.

Asia
Japan

Quick Enquiry

Submit your enquiry using our online form and include a brief message about the type of issues you are experiencing. One of the Mainmark experts will contact you as soon as possible.

W25GV2369

Keeping The City Moving With Tramline Stabilisation

Sub-industry
Tramline
Problems
Slab Lifting
Location
Australia
Year
2025
Solutions
Re-levelling
Technology
Teretek®

Problem

A nearby irrigation failure caused excessive water flow beneath the tramline at Victoria Square Station in Adelaide. This led to voids and a loss of support in the basalt fill beneath the track, causing early signs of instability, safety concerns, and potential service disruptions.

The tramline at Victoria Square Station in Adelaide faced a significant structural challenge due to an irrigation failure. Excessive water from the malfunctioning irrigation system seeped into the ground beneath the tracks, causing erosion of the supporting soils. This erosion resulted in the formation of voids that compromised the support beneath the concrete tramline. The instability was evident through early signs of track rocking and deflecting under load, which raised safety concerns and heightened the risk of potential service disruptions.

Solution

Taking advantage of a scheduled tramline shutdown, Mainmark was engaged to rectify the problem through the application of Teretek® resin injection technology.

This process involved injecting a resin-based geopolymer beneath the 30m² section of the compromised track. The innovative solution effectively filled voids, provided ground improvement and restored a solid support base beneath the concrete tramway. Teretek® rapid strength gain properties allowed for effective reinforcement with minimal disturbance to the existing infrastructure.

Result

Within just a few hours, Mainmark successfully eliminated the rocking and deflection of the track restoring support, and significantly reducing safety risks and restoring structural integrity.

The rapid delivery ensured minimal downtime with all works completed within a scheduled shutdown, enabling the tram service to recommence without any extra delays.

This successful project improved passenger safety and maintained the tram system’s operational reliability. It showcased how a fast, non- invasive approach can effectively address infrastructure issues while ensuring safety and preserving service quality.

 

Need help?

Need help with a project? Contact us today.

Next Project

Restoring Track Performance at the Matapihi Rail Crossing

Mainmark

© 2026 The Mainmark group of companies. ‘Mainmark®’, ‘Terefil®’, ‘Terefirm®’ and ‘Teretek®’ are trademarks of the Mainmark group of companies.

Mainmark Ground Engineering (NZ) Ltd

ISO 9001
ISO 14001
ISO 45001

Solutions

Ground Improvement

Subsidence Repair

Re-Levelling

Void Filling

Slab Lifting

Crack Wall Repairs

Sinking Floor and Slab Repair

Sinking Foundation Repair

Underpinning

Soil Replacement

Specialties

Commercial

Residential

Seismic

Technologies

Teretek®

Terefil®

JOG

About Us

Our team

Careers

Media & Press

News

Awards

Contact

Locations
Mainmark Auckland

390 Neilson Street, Penrose, Auckland 1061

 

Mainmark Christchurch

2 Baigent Way, Middleton, Christchurch 8024

Privacy Policy

Terms and Conditions

Created by Codex

Facebook